Roofing Installation Process and Steps
- You will receive a call with a delivery date for your material. Please keep your driveway clear that day. Installation usually starts within days of the delivery (weather permitting).
- Remove existing shingles down to the plywood; inspect wood. Rotten or damaged wood will be replaced, quote on sight, upon customer notification.
- Furnish and install drip edge where applicable.
- Install Ice and Water Shield at the starter course, in valleys, and around skylights and chimneys.
- Install water resistant felt paper.
- Install shingles over felt paper.
- Install ridge vent and roof vents where applicable.
- Install flashing where necessary using non-corrosive flashing products.
- Replace all vent stack collars.
- Pick up loose nails with magnetic rake.
- Clean up and haul away all job related debris.
Please remove any valuables hanging on your walls as they may become unstable during the construction process.





